Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BCE
解析
暂无解析
相关试题
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
推荐试题
【单选题】
在智能组网施工流程的组网施工阶段,需要完成的工作不包含以下哪项()___
A. 线缆布放
B. 信息点安装
C. 设备、线缆选型
D. 设备安装调测
【单选题】
某客户有一套300平米的独栋别墅要组建家庭无线网络,要求使用统一的SSID,且能实现无线漫游的无缝切换,其各房间均布放有网线,以下哪种组网方案最适合该客户()。___
A. PoE交换机+AP
B. PoE交换机+AC+AP
C. 无线路由器+WiFi信号放大器
D. 多个无线路由器
【单选题】
虽然从蓝牙 4.0 开始引入了低功耗蓝牙(BLE)的技术,但蓝牙也有很明显的短板,它的理论连接设备能连接( )个设备。___
A. 5
B. 6
C. 7
D. 8
【单选题】
无线AP面板必须组合下列哪个设备才能正常使用( )。___
A. EOC
B. WOC适配器
C. POE交换机
D. 电力猫
【单选题】
无线AP面板中的无线隔离起什么作用?( )___
A. 关闭无线信号
B. 关闭无线信号的广播功能
C. 限制连接终端之间直接访问
D. 屏蔽除已连接之外的其他无线信号,防止干扰
【单选题】
下列关于无线Mesh组网说法不正确的是( )。___
A. 采用网状Mesh拓扑结构,是一种多点到多点网络拓扑结构
B. 无线Mesh网络中,每个Mesh节点都需要有线电缆连接
C. 在无线Mesh网络中,每个设备都有多个传输路径可用
D. 在高密度的城市网络环境中,Mesh网络能够减少使用无线网络的相邻用户的相互干扰,大大提高信道的利用效率
【单选题】
下列关于星型网络拓扑结构描述正确的是( )。___
A. 各接入点连至汇聚的链路确保为有线网络,确保网络的可靠性
B. 具有很高的健壮性,不存在单点故障
C. 网络负载过重时,会导致性能下降
D. 在星型拓扑中,某条线路的故障会影响其它线路通信
【单选题】
在电力猫的使用过程中,如有多台电脑(适合家庭),可在每一台电脑端再加载电力猫扩展,以此类推最多可以支持( )个扩展器。___
A. 9个
B. 7个
C. 5个
D. 3个
【单选题】
采用路由器+无线AP的组网模式,路由器放置在场景内综合布线汇聚点,选用带有POE功能的无线AP,将其分布在每个用户需要位置房间的吊顶或天花上方,并将AP的SSID与密码设置成与主路由器一致,所有用户终端将根据信号的强弱自动切换连接设备,所有的AP需要设置成( )。___
A. FIT模式
B. FAT模式
C. DHCP模式
D. 桥模式
【单选题】
国家规定,室内AP的发射功率为( )mW___
A. 500mW
B. 200mW
C. 100mW
D. 20mW
【单选题】
家中五类线综合布线完善,但多媒体箱内无电源,我可以通过( )技术帮助用户解决问题。___
A. EOC
B. WOC
C. POE
D. AP面板
【单选题】
家中只布有同轴电缆,现需要进行无线覆盖,我可以通过( )技术帮助用户解决问题。___
A. EOC
B. WOC
C. POE
D. AP面板
【单选题】
两个路由器通过有线实现同一个SSID,同一个网段,这种组网方式为以下哪种?( )___
A. WOC组网
B. EOC组网
C. 有线桥接
D. 无线桥接
【单选题】
两台无线桥接,( )必须相同。___
A. SSID
B. 信道
C. MAC地址
D. 设备一致
【单选题】
室内组网,住宅内已有家庭布线不合理的情况应进行适当调整:按( )汇聚至线缆汇聚点___
A. 树形结构
B. 环形结构
C. 总线型结构
D. 星型结构
【单选题】
用户反映家中路由器数量过多,导致从客厅移动至书房时,必须手动将无线网从客厅路由器切换至书房路由器,以下哪种方案能解决此类问题()___
A. 将所有路由器的SSID和密码改为一致
B. 采用AC+瘦AP组网方式对用户家庭无线网络进行改造
C. 采用cable猫组网技术对用户家庭无线网络进行改造
D. 以上三种解决方案均可
【单选题】
用户家,75㎡面积、二室一厅,平时就用手机看看新闻、查查股票,有一个 TPLINK路由在客厅,但卧室无线信号不太稳定,以下哪种组网方式比较贴合该场景( ) ___
A. 无线扩展器
B. 有线桥接
C. 电力设备
D. AP面板
【单选题】
用户家60㎡,二室一厅客厅使用路由,卧室无线信号不好,可使用()比较贴切。___
A. 路由器
B. POE交换机+AP
C. 无线放大器
D. 电力猫
【单选题】
在给用户做智能组网时,以下Wi-Fi信号强度是最好的?( )___
A. 40dBm
B. 50dBm
C. 60dBm
D. 70dBm
【单选题】
在家庭组网中,无线产品最大发射功率为100mW,相当于( )。___
A. 1dbm
B. 10dbm
C. 20dbm
D. 30dbm
【单选题】
在家庭组网中,下列障碍物中,()对无线信号的损耗最大。___
A. 金属柜
B. 办公室窗户
C. 玻璃墙
D. 砖墙
【单选题】
下列对于智能门锁描述正确的是( )___
A. 智能门锁只能通过手机解锁
B. 智能门锁如果没电就无法打开
C. 目前仅有少部分智能门锁采用了生物识别技术
D. 如今的智能门锁密码开锁基本都采用了虚位密码的模式
【单选题】
下列关于万能遥控器说法正确的是?( )___
A. 所有万能遥控器均支持红外和射频遥控
B. 万能遥控器可遥控蓝牙模式遥控的电器
C. 万能遥控可隔墙遥控红外家电
D. 万能遥控器支持红外遥控学习功能
【单选题】
下列关于智能门锁说法正确的是( )?___
A. 任何门均可安装智能门锁
B. 智能门锁均具备防猫眼开锁功能
C. 智能门锁功耗较高,因此需外接电源进行供电
D. 智能门锁安装前需核实门的开门方向和锁体的类型
【单选题】
以下不属于智能家居控制交互手段的是( )。___
A. 语音
B. 手势
C. 自动检测
D. 手机APP
【单选题】
以下哪个不是家庭安防系统的设备()。___
A. 智能门锁
B. 监控摄像头
C. 安防传感器
D. 无线开关
【单选题】
以下哪项智能家居设备能实现定时开关电器/节能的效果( )。___
A. 红外感应器
B. 万能遥控器
C. 智能插座
D. Zigbee网关
【单选题】
在同一个无线传感网中下列选项表达错误的是什么?( )___
A. MAC地址不可以相同
B. PANID必须一致
C. 通道号可以不同
D. PANID,通道号都必须一致
【单选题】
在以下描述是Zigbee协议的哪一项功能:增加或删除一个节点,节点位置发生变动,节点发生故障等等,网络都能够自我恢复并对网络拓扑结构进行相应调整,无需人工干预,保证整个系统仍然能正常工作。( )___
A. 自愈功能
B. 自组织功能
C. 碰撞避免机制
D. 数据传输机制
【单选题】
在只有同轴电缆无五类线的房间内增强无线信号可以采用( )技术。___
A. POE
B. 电力猫
C. EOC
D. WOC
【单选题】
在智能照明系统中,为了实现人来灯亮,人走灯灭的节能效果,不需要使用以下哪项设备( )。___
A. 人体传感器
B. 智能开关
C. 智能灯
D. 门窗磁传感器
【单选题】
智慧家庭的底层架构是( )。___
A. 物联网
B. 大数据
C. 云计算
D. 移动互联网
【单选题】
智慧家庭的信息安全隐患不包括( )。___
A. 访问权限使用默认设置
B. 禁止设备联网更新
C. 家庭网关采用市电供电
D. 设备采用默认密码
【单选题】
智能家居八大系统中,( )相当一个人的大脑,支配着身体上各器官的运行。___
A. 控制管理系统
B. 家居布线系统
C. 家庭网络系统
D. 远程控制系统
【单选题】
智能摄像头的无线网络接入技术为( )。___
A. WIFI
B. Zigbee
C. 蓝牙
D. NFC
【单选题】
电线变网线,插座变网口是哪种组网技术的产品特点( )。___
A. PoE
B. PLC电力猫
C. EoC
D. 无线AP
【单选题】
工作区安装在墙面上的信息插座,一般要求距离地面( )cm以上。___
A. 20
B. 30
C. 40
D. 50
【单选题】
监控摄像头的无线网络接入方式为( )。___
A. WiFi
B. ZigBee
C. 蓝牙
D. NFC
【单选题】
扩展型AP(胖AP)相当于带有无线覆盖功能的( ),它主要应用于用户上网和无线覆盖。___
A. modem
B. 路由器
C. 中继器
D. 网桥设备
【单选题】
用户端光终端盒宜安装固定在墙壁上,盒底边距地坪( )为宜。___
A. 0.5m
B. 0.4m
C. 0.3m
D. 0.2m