【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
推荐试题
【单选题】
关于精馏塔塔压差高的原因,下列叙述正确的是___。
A. 负荷变小
B. 塔顶采出量大
C. 塔加热量小
D. 塔釜采出量小
【单选题】
精馏塔压差高的原因是___。
A. 进料减小
B. 回流增大
C. 加热减小
D. 塔顶采出量增大
【单选题】
下列选项中,不会造成碳二加氢反应器出口分析不合格的是___。
A. 氢气压力波动
B. 氢气纯度下降
C. 活性严重降低,调整无效
D. 氢炔比稍大
【单选题】
下列选项中,会造成碳二加氢反应器出口分析不合格的是___。
A. 负荷偏低
B. 氢气纯度太高
C. 催化剂选择性高
D. 催化剂中毒
【单选题】
甲烷化反应器进料过少会导致___。
A. 催化剂中毒
B. 飞温
C. CO不反应
D. 甲烷量过大
【单选题】
关于脱丙烷塔再沸器结焦的原因,正确的是___。
A. 装置负荷波动
B. 塔釜温度长时间过高
C. 灵敏板温度偏低
D. 塔釜阻聚剂注入量过大
【单选题】
关于脱丙烷塔再沸器结焦的原因,不正确的是___。
A. 塔釜液位长时间过高或过低
B. 阻聚剂变质
C. 阻聚剂泵长时间不上量
D. 塔釜阻聚剂注入量过大
【单选题】
在低压脱丙烷塔塔操作中,应注意塔釜温度不能过高,否则,再沸器容易出现___。
A. 液泛
B. 堵塞
C. 冻塔
D. 结焦
【单选题】
精馏塔顶温高的原因是___。
A. 塔压高
B. 回流量大
C. 加热量小
D. 进料温度低
【单选题】
关于精馏塔顶温高的原因,下列说法不正确的是___。
A. 塔压低
B. 回流量小
C. 加热量大
D. 进料温度高
【单选题】
精馏塔塔压联锁的原因是___。
A. 加热量提得太快
B. 回流量太大
C. 进料量增大
D. 塔釜采出量太少
【单选题】
关于精馏塔塔压联锁的原因,下列说法正确的是___。
A. 加热量太小
B. 塔顶采出量过大
C. 进料中轻组分含量过高
D. 塔釜采出量太少
【单选题】
精馏塔塔顶分析不合格的原因是___。
A. 塔顶采出量过大
B. 灵敏板温度低
C. 回流量大
D. 塔顶采出量小
【单选题】
关于精馏塔塔顶分析不合格的原因,下列说法不正确的是___。
A. 塔顶采出量过大
B. 灵敏板温度高
C. 加热量过大
D. 加热量过小
【单选题】
精馏塔塔釜分析不合格,轻组分浓度高的原因是___。
A. 灵敏板温度高
B. 灵敏板温度低
C. 塔釜加热量大
D. 塔顶采出量大
【单选题】
精馏塔塔釜分析不合格,轻组分浓度高,下列说法不正确的是___。
A. 塔釜液面过低
B. 灵敏板温度低
C. 回流量过大
D. 塔釜加热量大
【单选题】
精馏塔塔釜液面空的原因不包括___。
A. 塔釜采出量过大
B. 塔釜加热量过大
C. 进料组成变轻
D. 进料量增大
【单选题】
紧急停车时,关于分离系统的处理,下列说法错误的是___。
A. 统一指挥冷静果断
B. 停膨胀机再压缩机
C. 反应器按手动停车
D. 切断产品外送
【单选题】
紧急停车时,关于分离系统的处理,下列说法正确的是___。
A. 各精馏塔泄压至火炬
B. 各系统要保持相连
C. 各反应器泄压
D. 保证产品外送
【单选题】
碳二加氢反应器紧急停车的处理原则是___。
A. 乙烯精馏塔不被乙炔污染
B. 乙烯精馏塔停车
C. 脱乙烷塔停车
D. 冷区全线停车
【单选题】
裂解气干燥器出口水分提前不合格,处理方法不正确的是___。
A. 提高裂解气的进料温度
B. 尽快投用备用台,查找原因并处理
C. 降低裂解气温度
D. 严格控制再生条件
【单选题】
裂解气碱洗不合格,会造成分子筛中毒,干燥器出口水分会提前不合格,正确的处理方法是___。
A. 立即关闭裂解气干燥器的进出口阀
B. 尽快调整碱洗,碱洗合格后投用备用台
C. 立即切换至备用台
D. 分离系统紧急停车
【单选题】
硫化氢的中毒机理是___。
A. 硫化氢无毒,但具有强烈的腐蚀性
B. 硫化氢是强烈的神经毒物,与细胞色素氧化酶作用引起组织缺氧
C. 吸入硫化氢与血红蛋白结合使人失去呼吸功能全身缺氧
D. 硫化氢无毒,但人体吸入会排挤空气中的氧使人窒息
【单选题】
关于对一氧化碳中毒人员的救护,下列说法正确的法是___。
A. 将中毒人员撤离污染区域,必要时施行人工呼吸,输氧,立即请医生治疗
B. 中毒人员不宜移动,应现场急救
C. 若中毒者停止呼吸,就可放弃
D. 若心脏停止跳动,现场人员不可处理,必须等医生到来进行专业抢救
【单选题】
关于对硫化氢中毒人员的救护,下列说法正确的是___。
A. 中毒人员不宜移动,应现场抢救
B. 将中毒人员直接送往医院
C. 将中毒人员撤离现场,进行急救,并尽快送医院
D. 在现场用大量清水冲洗
【单选题】
冷箱系统压差过大、温度分布异常,处理方法不正确的是___。
A. 检查碱洗塔的运行情况
B. 检查裂解气干燥状况,如冻堵,则注入甲醇解冻
C. 检查各过滤器,并用木锤敲打
D. 投用氢气开工线(氢气并低压甲烷线)
【单选题】
对于冷箱系统压差过大的处理方法,下列选项不正确的是___。
A. 严重时,作停车处理
B. 检查裂解气干燥状况,如冻堵,则注入甲醇解冻
C. 检查各过滤器,并用木锤敲打
D. 切换干操器即可
【单选题】
精馏塔冻塔的处理方法正确的是___。
A. 降加热
B. 增大采出
C. 减小进料
D. 注甲醇解冻
【单选题】
精馏塔灵敏板、釜温提不起来的处理方法正确的是___。
A. 在保证产品质量的前提下,适当降低塔顶回流量
B. 提高塔顶回流量
C. 增加进料量
D. 增加采出量
【单选题】
精馏塔灵敏板、釜温低时正确的处理方法是___。
A. 降低塔釜液面
B. 提高塔顶回流量
C. 增加进料量
D. 提高塔釜加热量
【单选题】
关于精馏塔灵敏板、釜温提不起来的原因,下列叙述不正确的是___。
A. 塔釜重组分多
B. 再沸器结垢
C. 回流量过大
D. 中沸器加热量大
【单选题】
精馏塔塔釜分析不合格,轻组分浓度高,下列说法不正确的是___。
A. 塔釜液面过低
B. 灵敏板温度低
C. 回流量过大
D. 塔釜加热量大
【单选题】
碳二加氢反应器温度上涨,但不是很快,最有效的处理方法是___。
A. 一发现温度上升较快即关闭氢气阀
B. 停止入口加热
C. 降低入口温度
D. 适当注入粗氢
【单选题】
关于碳二加氢反应器飞温的处理方法,下列说法正确的是___。
A. 降低氢炔比
B. 降低入口温度
C. 如备用台飞温则关紧各进出口氢气阀门
D. 碳二加氢反应器泄压至火炬
【单选题】
碳二加氢反应器飞温的处理方法正确的是___。
A. 全开段间冷却器冷却水
B. 降低入口温度
C. 反应器按SD2停车
D. 增加一氧化碳降低催化剂活性
【单选题】
碳二加氢反应器催化剂中毒时下列处理方法正确的是___。
A. 降低反应器入口温度
B. 压缩调整碱洗至合格
C. 降低氢炔比
D. 切换裂解气干燥器
【单选题】
碳二加氢反应器催化剂中毒的处理方法不正确的是___。
A. 提高反应器入口温度
B. 压缩调整碱洗至合格
C. 降低氢炔比
D. 碱洗合格后切换裂解气干燥器及碳二加氢反应器
【单选题】
当乙烯精馏塔产品乙烷超标时,正确的处理方法是___。
A. 调整乙烯精馏塔的操作
B. 调整碳二加氢反应器的操作
C. 调整脱乙烷塔的操作
D. 调整脱甲烷塔的操作
【单选题】
当丙烯产品分析不合格MAPD超标时,处理方法正确的是___。
A. 调整凝液汽提塔的操作
B. 调整脱丙烷塔的操作
C. 调整脱丁烷塔的操作
D. 调整碳三加氢反应器的操作
【单选题】
当碳四产品不合格,碳三含量超标时,处理方法正确的是___。
A. 调整脱丙烷塔的操作
B. 调整丙烯精馏塔的操作
C. 调整碳三加氢反应器的操作
D. 调整丙烷精制塔的操作