【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BD
解析
暂无解析
相关试题
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
【多选题】
意识的能动作用表现在___
A. 反映客观世界
B. 创造物质世界
C. 通过实践改造客观世界
D. 创造理论体系
E. 为自然界创造秩序
【多选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【多选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【多选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【多选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【判断题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 对
B. 错
【判断题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 对
B. 错
【判断题】
而非热舞法国会开绿灯技术的()
A. 对
B. 错
【判断题】
十大富豪不给发货返回返回返回()
A. 对
B. 错
【判断题】
豆腐干地方梵蒂冈热的()
A. 对
B. 错
【判断题】
豆腐干沙发沙发地方梵蒂冈热的()
A. 对
B. 错
【填空题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
【填空题】
金克拉金克拉撒退热贴开绿灯技术的()
推荐试题
【多选题】
列车员___到站前、后对车厢水位进行检查确认并报告列车长。
A. 中途站
B. 上水站
C. 终到站
D. 停车站
【多选题】
全局无线电管理实行___、统一规划、(BC )的原则,贯彻科学管理、有利发展的方针。
A. 逐级领导
B. 统一领导
C. 逐级负责
D. 站段管理
【多选题】
GSM-R数据包括___数据
A. 网络数据
B. 终端数据
C. 鉴权数据
D. 通信用地理信息
【多选题】
PIS系统具有___等功能
A. 旅行信息显示
B. 广播通告
C. 内部通讯
D. 娱乐服务
【多选题】
高速动车组牵引动力的配置基本上有两种形式,即___配置型和(AB )配置型。
A. 集中
B. 分散
C. 全自动
D. 半自动
【多选题】
按动车组车辆转向架布置和车辆之间的连接方式,分为___转向架式和(BC )转向架式。
A. 集中
B. 独立
C. 铰接
D. 分散
【多选题】
各型动车组的型号系列代码按动车组的___、(ACD )、(ACD )确定。
A. 速度
B. 车型
C. 等级
D. 车种
【多选题】
CRH5A型动车组动力结构中,___车为拖车。
A. 1
B. 3
C. 5
D. 6
【多选题】
CRH5A型动车组,1、8车设有司机室,受电降弓在___车顶部。
A. 1
B. 3
C. 5
D. 6
【多选题】
CRH5A型动车组,车体定员分为___。
A. 622
B. 621
C. 586
D. 570
【多选题】
CRH5A型动车组每节车厢外部设有显示屏,显示___等
A. 车厢号
B. 车次
C. 时间
D. 到发站名
【多选题】
CRH5A型动车组,___车只有两个塞拉门
A. 1
B. 5
C. 6
D. 8
【多选题】
CRH5A型动车组,每辆车均在二位端车下配有___。
A. 净水箱
B. 转向架
C. 万向轴
D. 污水箱
【多选题】
CRH5A型动车组,塞拉门外部有以下设施:___。
A. 开门按钮
B. 外紧急解锁手柄
C. 带外盖的隔离锁
D. 低站台滑动踏板
【多选题】
CRH5A型动车组,塞拉门状态指示灯有___颜色显示。
A. 红
B. 黄
C. 绿
D. 白
【多选题】
CRH5A型动车组正常状态下手动开启塞拉门,会用到___。
A. 紧急解锁三角锁
B. 紧急解锁按钮
C. 红色紧急解锁手柄
D. 绿色开门按钮
【多选题】
CRH5A型动车组内部门包括___。
A. 客室端的内端门
B. 车端位于折棚风挡处的防火门
C. 司机登乘门
D. 驾驶室门
【多选题】
CRH5A型动车组内端门用于___。
A. 防止火势蔓延
B. 降低来自车门通过台处的噪音
C. 防止旅客到其他车厢
D. 保持车内环境温度
【多选题】
CRH5A型动车组防火门用于___。
A. 隔绝车端连接处的噪音
B. 保持车厢温度
C. 延缓烟、火的蔓延速度
D. 防止旅客越席
【多选题】
CRH5A型动车组有固定座椅及旋转座椅两种布置方式,每种座椅又分___形式。
A. 特等
B. 一等
C. 二等
D. 商务
【多选题】
CRH5A动车组客室照明可进行___控制。
A. 单车
B. 连接
C. 集控
D. 选择性
【多选题】
CRH5A型动车组在每辆车的___部位设置烟火报警器。
A. 餐车
B. 配电柜(QEL)柜
C. 客室
D. 卫生间
【多选题】
当CRH5A型动车组列车发生火灾事故时,烟火报警启动,在___报警。
A. 司机室声光报警
B. 客室的QRK柜的烟火报警状态指令板
C. 机械间PIS屏
D. 乘务室PIS屏
【多选题】
CRH5A型动车组列车客室的QRK柜的烟火报警状态指令板上有___指示灯。
A. 工作灯
B. 报警灯
C. 测试灯
D. 故障灯
【多选题】
CRH5A型动车组列车客室的QRK柜的烟火报警状态指令板上有___按钮。
A. 测试
B. 静音
C. 启动
D. 停止
【多选题】
CRH5A型动车组列车客室的QRK柜内可以进行___操作。
A. 温度调节
B. 照明控制
C. 查看水位
D. 烟雾报警显示
【多选题】
CRH5A型动车组QRK柜内的空调控制调节使用的温度微调钮有___档位。
A. 0
B. 1
C. 2
D. -1
【多选题】
CRH5A型动车组车在广播系统包含___。
A. 定时广播
B. 人工公共广播
C. 手动广播
D. 自动广播
【多选题】
CRH5A型动车组在___设置了SOS紧急呼叫按钮。
A. 残疾人服务区的侧墙上
B. 残疾人卫生间内的门口内侧
C. 残疾人卫生间内便器旁墙壁上
D. 残疾人专用坐席扶手上
【多选题】
CRH5A型动车组,乘客紧急制动手柄设置在___位置。
A. 监控室
B. 车厢两端
C. 酒吧车
D. 司机室
【多选题】
CRH5A型动车组电茶炉表面有___指示灯
A. 加热
B. 热水
C. 缺水
D. 电源
【多选题】
CRH5A型动车组电茶炉正常工作时___灯点亮
A. 加热
B. 热水
C. 缺水
D. 电源
【多选题】
CRH5A型动车组PIS系统用于发送___。
A. 列车停站的文字及声音信息
B. 娱乐节目及音乐
C. 广播的信息
D. 烟感、SOS求助报警
【多选题】
ATP列车超速防护控制系统,简称列控系统。作用是___。
A. 防超速、冒进
B. 导向列车运行安全的目地
C. 记录司机操作过程
D. 为事故分析提供依据
【多选题】
LKJ列车运行监控记录装置,作用是___。
A. 防超速、冒进
B. 导向列车运行安全的目地
C. 记录司机操作过程
D. 为事故分析提供依据
【多选题】
CRH5A型动车组:允许配置额定功率___ kW微波炉1台、额定功率(CD ) kW微波炉2台。
A. 3.5
B. 1.8
C. 2.9
D. 1.7
【多选题】
判断灭火器是否有效需要检查___。
A. 铅封有无破封
B. 卡销是否完整好用
C. 压把是否变形
D. 喷嘴是否完好
E. 年检标记是否在有效期内
F. 此题无答案
【多选题】
动车组广播通告:分为___。
A. 自动触发预录的广播
B. 手动触发预录的广播
C. 人工广播
D. 内部通讯
【多选题】
沈阳铁路局动车组专业管理实施细则:自动广播装置的广播内容由___负责按规定要求录制,(BD )负责输入自动广播装置。
A. 铁路局
B. 客运段
C. 动车段
D. 车辆段
【多选题】
承担动车组___、(ABC )、(ABC )级修程的动车段还应具备动车组相应修程的检修能力。
A. 三
B. 四
C. 五
D. 六