【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
推荐试题
【多选题】
编制脚手架工程量清单时,其工作内容不包括( )。
A. 场内、场外材料搬运
B. 安全网的铺设
C. 选择附墙点与主体连接
D. 钢筋安装
【多选题】
编制脚手架工程量清单时,下列说法正确的是( )。
A. 综合脚手架适用于房屋加层、构筑物
B. 同一建筑物有不同檐高时,应按建筑物竖向切面分别按不同檐高编列清单项目
C. 脚手架材质无需描述
D. 脚手架属于总价措施项目
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),关于招标控制价的表述符合规定的是( )。
A. 招标控制价不能超过批准的概算
B. 招标控制价可上下浮动调整3%
C. 招标控制价不应在招标文件中公布,应予保密
D. 工程造价咨询人不得同时编制同一工程的招标控制价和投标报价
【多选题】
工程造价管理机构接到投标人投诉,经复查,若招标控制价的误差超过( )时,应责成招标人改正。
A. ±5%
B. ±3%
C. ±2%
D. ±1%
【多选题】
关于招标控制价,下列说法中正确的是( )。
A. 招标人不得拒绝高于招标控制价的投标报价
B. 利润可按建筑施工企业平均利润率计算
C. 招标控制价超过批准概算10%时,应报原概算审批部门审核
D. 经复查的招标控制价与原招标控制价误差大于±3%的应责成招标人改正
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),关于招标控制价的编制要求,下列说法中正确的是( )。
A. 应依据投标人拟定的施工方案进行编制
B. 应包括招标文件中要求招标人承担风险的费用
C. 应由招标工程量清单编制单位负责编制
D. 应使用行业和地方的计价定额与相关文件计价
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013)中对招标控制价的相关规定,下列说法正确的是( )。
A. 招标控制价公布后根据需要可以上浮或下调
B. 招标人可以只公布招标控制价总价,也可以只公布单价
C. 招标控制价可以在招标文件中公布,也可以在开标时公布
D. 高于招标控制价的投标报价应被拒绝
【多选题】
暂估价中的材料单价应按照( )发布的工程造价信息中的材料单价计算。
A. 市场
B. 建设部
C. 工程造价管理机构
D. 国家或省级、行业建设主管部门
【多选题】
招标人自行供应材料的,总承包服务费按招标人供应材料价值的( )计算。
A. 1%
B. 1.5%
C. 3%
D. 5%
【多选题】
编制招标控制价时,不可竞争的费用不包括( )。
A. 安全文明施工费
B. 规费
C. 税金
D. 夜间施工增加费
【多选题】
下列各项内容中属于施工招标文件中投标人须知的有( )。
A. 合同条款及格式
B. 开标的时间
C. 中标通知书的发出时间
D. 招标文件的澄清和修改
E. 投标准备时间
【多选题】
下列关于招标工程量清单的描述,说法正确的有( )。
A. 招标工程量清单是招标文件的组成部分,可以由招标人委托的工程造价咨询人编制
B. 招标人对工程量清单的准确性和完整性负责
C. 由于措施项目投标人可自行选择,因此招标人无需对措施项目工程量的准确性和完整性负责
D. 招标工程量清单编制前也要进行现场踏勘
E. 招标工程量清单编制前应拟订常规施工组织设计
【多选题】
编制招标工程量清单的原则包括( )。
A. 实体净量
B. 量价分离
C. 风险分担
D. 风险规避
E. 利率变动
【多选题】
招标人编制工程量清单前,需事先拟订施工总方案,其主要内容包括( )。
A. 施工方法
B. 施工步骤
C. 施工机械设备的选择
D. 施工组织
E. 施工进度
【多选题】
招标工程量清单编制的准备工作中,需要进行现场踏勘时,属于对施工条件调查的有( )。
A. 工程所在地的地理位置
B. 地质构造及特征
C. 地质承载能力
D. 工程现场周围的道路情况
E. 当地政府有关部门对施工现场管理的特殊要求
【多选题】
关于工程量清单中的项目特征描述,下列表述正确的有( )。
A. 必须对项目特征进行准确和全面的描述
B. 应能满足确定综合单价的需要
C. 不能直接采用详见××图集的方式
D. 若标准图集或施工图纸不能满足项目特征描述要求的部分项目,应用文字描述
E. 应结合拟建工程的实际
【多选题】
按《建设工程工程量清单计价规范》的规定,招标人提供的其他项目清单应包括( )。
A. 暂列金额
B. 暂估价
C. 计日工
D. 总承包服务费
E. 规费
【多选题】
工程量的计算是一项繁杂而细致的工作,为了计算的快速准确并尽量避免漏算或重算,应遵循的计算
A. 计算口径一致
B. 按工程量计算规则计算
C. 按一定顺序计算
D. 按图纸计算
E. 按工程内容的重要程度计算
【多选题】
下列属于招标控制价的编制依据的有( )。
A. 建设工程设计文件
B. 招标工程量清单
C. 企业定额
D. 工程特点
E. 常规施工方案
【多选题】
招标工程量清单中某分部分项清单项目与某一计价定额子目的工作内容与计量规则一致,则确定该清单项目综合单价不可或缺的工作是( )。
A. 计算工程内容的工程数量
B. 计算工程内容的清单单位含量
C. 计算措施项目的费用
D. 计算管理费、利润和风险费用
【多选题】
施工投标报价的主要工作有:①取得招标信息,②复核工程量,③编制投标文件,④选择报价策略调整标价。其正确的工作流程是( )。
A. ①②③④
B. ②③①④
C. ①②④③
D. ②①③④
【多选题】
施工项目投标报价的工作包括:①收集投标信息;②选择报价策略;③组建投标班子;④确定基础标价;⑤确定投标报价;⑥研究招标文件,以下工作正确的先后顺序是( )。
A. ⑥①③②④⑤
B. ③⑥①④②⑤
C. ③①⑥②④⑤
D. ⑥③①④②⑤
【多选题】
施工投标报价的主要工作有:①复核工程量,②研究招标文件,③确定基础标价,④制定项目管理规划,⑤编制投标文件,其正确的工作流程是( )。
A. ①④②③⑤
B. ④②③①⑤
C. ①②④⑤③
D. ②①④③⑤
【多选题】
施工投标报价工作包括:①工程现场调查;②组建投标报价班子;③确定基础报价;④制定项目管理规划;⑤复核清单工程量。下列工作排序正确的是( )。
A. ①④②③⑤
B. ②③④①⑤
C. ①②③④⑤
D. ②①⑤④③
【多选题】
投标人在投标前期研究招标文件时,对合同形式进行分析的主要内容为( )。
A. 承包商任务
B. 计价方式
C. 付款办法
D. 合同价款调整
【多选题】
关于调查询价,生产要素询价中不包括( )。
A. 材料询价
B. 劳务询价
C. 分包询价
D. 施工机具询价
【多选题】
投标人投标报价之前,会通过各种渠道进行询价,下列渠道中,询价资料最为可靠的是( )。
A. 直接与生产厂商联系
B. 与生产厂商的代理人联系
C. 互联网查询
D. 向咨询公司询价
【多选题】
复核工程量是投标人编制投标报价前的一项重要工作。关于复核工程量,下列说法错误的是( )。
A. 可以决定报价尺度
B. 对于工程量清单存在的错误,可以直接修改
C. 根据工程量的大小采取合适的施工方法
D. 正确划分分部分项工程项目,与“清单计价规范”保持一致
【多选题】
关于投标报价的说法,正确的是( )。
A. 询价通常可向生产厂商、销售商、咨询公司以及招标人询问
B. 投标人可以利用工程量清单的错、漏、多项,运用投标技巧,提高报价质量
C. 复核工程量清单中的工程量,对于有明显错误的可以修改清单工程量
D. 只要投标人的标价明显低于其他投标报价,评标委员会就可作为废标处理
【多选题】
关于工程施工投标报价过程中的工程量复核,下列说法正确的是( )。
A. 复核的准确程度不会影响施工方法的选用
B. 复核的目的在于修改工程量清单中的工程量
C. 复核有助于防止由于物资少购带来的停工待料
D. 复核中发现的遗漏和错误应向招标人提出
【多选题】
下列不属于投标报价编制依据的是( )。
A. 工程量清单计价规范
B. 拟定的招标文件及招标工程量清单
C. 建设工程设计文件及相关资料
D. 市场价格信息或工程造价管理机构发布的工程造价信息
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),关于承发包双方施工阶段风险分摊原则的表述正确的是( )。
A. 各类原因所致人工费变化的风险由承包人承担
B. 10%以内的材料价格风险由承包人承担
C. 10%以内的施工机具使用费风险由承包人承担
D. 5%以内的人工费风险由承包人承担
【多选题】
工程量清单计价模式下进行投标报价时,确定综合单价的工作包括:①分析各清单项目的工程内容;②确定计算基础;③计算人工、材料、施工机具使用费;④计算工程内容的工程数量与清单单位含量;⑤计算综合单价。对上述工作先后顺序的排列,正确的是( )。
A. ①②④⑤③
B. ②①④③⑤
C. ①②④③⑤
D. ②①④⑤③
【多选题】
确定投标报价中的综合单价时,确定计算基础主要是指( )。
A. 确定每一清单项目的工作内容
B. 确定每一清单项目的清单单位含量
C. 确定每一清单项目的人工、材料、机械费
D. 确定消耗量指标和生产要素单价
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),在招标文件未另有要求的情况下,投标报价的综合单价一般要考虑的风险因素是( )。
A. 政策法规的变化
B. 人工单价的市场变化
C. 政府定价材料的价格变化
D. 管理费、利润的风险
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),关于施工发承包投标报价的编制,下列做法正确的是( )。
A. 设计图纸与招投标工程量清单项目特征描述不同的,以设计图纸特征为准
B. 暂列金额应按照招投标工程量清单中列出的金额填写,不得变动
C. 材料、工程设备暂估价应按暂估单价,乘以所需数量后计入其他项目费
D. 总承包服务费应按照投标人提出的协调、配合和服务项目自主报价
【多选题】
有关措施项目清单与计价表的编制规定,下列表述错误的是( )。
A. 夜间施工增加费应当列入总价措施项目清单与计价表编制
B. 模板及脚手架费应当按照综合单价方式编制
C. 措施项目清单中的安全文明施工费作为竞争性费用按规定计价
D. 可以计算工程量的措施项目,可采用分部分项工程量清单的方式编制
【多选题】
根据《建设工程工程量清单计价规范》(GB 50500-2013),允许投标人根据具体情况对招标工程量清单进行修正或增加的内容是( )。
A. 分部分项工程量清单
B. 措施项目清单
C. 暂列金额
D. 计日工
【多选题】
关于其他项目中的暂列金额,投标人正确的报价方式是( )。
A. 按政策规定标准估算报价
B. 按招标文件提供的金额报价
C. 自主报价
D. 待签证时报价
【多选题】
对于其他项目中的专业工程暂估价,投标人正确的报价方式是( )。
A. 按政策规定标准估算报价
B. 按招标文件提供的金额报价
C. 自主报价
D. 待签证时报价