【单选题】
Assuming a mirrored (RAID-1) object configuration, how many hosts must contribute storage in a non-stretched VMware vSAN cluster to satisfy the “Number of failures to tolerate” policy option?“n” is the desired “Number of failures to tolerate” value for all options.___
A. 2n+2
B. 2n
C. 2n+1
D. 3n
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
C
解析
暂无解析
相关试题
【单选题】
An administrator must change the statistics level for short-term performance monitoring and wants to collect metrics for all counters, excluding minimum and maximum rollup values. What would be the statistics level?___
A. Level 3
B. Level 1
C. Level 2
D. Level 4
【单选题】
In a vSphere environment, two resource pools are created as shown in the Exhibit. Each VM is configured with 1 GB of memory. When the administrator tried to power on VM3, the operation failed. What action in the resource pool settings will allow VM3 to power on successfully?___
A. Deselect Expandable Memory Reservation
B. Increase Memory Reservation
C. Deselect Expandable CPU Reservation
D. Increase the CPU Reservation
【单选题】
Which network is used by vSphere HA when VMware vSAN is enabled?___
A. Management network
B. vSphere Replication network
C. vMotion network
D. VSAN network
【单选题】
Which statement is correct when migrating from a Windows vCenter Server to the vCenter Server Appliance 6.5?___
A. Migration deployments do not migrate local OS users from the source vCenter Server.
B. Migration deployments support DHCP on the source vCenter Server.
C. Migration deployments allow the source vCenter Server to remain powered on afterwards.
D. Migration deployments support custom ports for all services on the source vCenter Server.
【单选题】
How can failback of a recovered virtual machine in vSphere Replication be performed?___
A. No action required, because failback is automatically performed to the source site.
B. Configure a new replication in the reverse direction at the target site.
C. Disable or Stop the virtual machine replication on the source site.
D. Power off and unregister the virtual machine on the target site.
【单选题】
After upgrading the vSphere infrastructure and VMware Tools to version 6.5, the “Upgrade VM Compatibility” option is grayed out in the vSphere Web Client. (See Exhibit.) What must the administrator do to enable the VM compatibility upgrade?___
A. VMware Tools should be upgraded last.
B. Restart the ESXi server.
C. Uninstall VMware Tools.
D. Power off the virtual machine.
【单选题】
What availability mode does vCenter HA provide?___
A. Active-Passive
B. Active-Standby
C. Active-Active
D. Load-balanced
【单选题】
In which scenario will vSphere DRS balance resources when set to Fully Automated?___
A. Hosts with only shared storage
B. Hosts are part of a vSphere HA cluster
C. Power Management is set to Balanced on hosts
D. Hosts with shared or non-shared storage
【单选题】
What VMware technology can be used to move physical servers to the vSphere infrastructure?___
A. VMware vMotion
B. VMware Converter
C. VMware vCenter Server
D. OVF transport
【单选题】
Upgrading vCenter Server with Microsoft SQL database fails with the following error message: The DB User entered does not have the required permissions needed to install and configure vCenter Server with the selected DB. Please correct the following error(s): %sWhat could cause this error?___
A. incorrect ports open on SQL Server
B. incorrect database on the SQL server
C. incorrect compatibility mode on the SQL server
D. incorrect permission on SQL Server database
【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
A. 1
B. 64
C. 3
D. 2
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
【单选题】
vCenter Server Appliance Instance can be backed up using which Client Interface?___
A. vSphere Client Interface
B. vSphere Web Client Interface
C. VMware Host Client Interface
D. Virtual Appliance Management Interface
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
【单选题】
Which storage feature always requires the use of third-party software on ESXi?___
A. Hardware Acceleration for NAS devices
B. VVOL
C. Hardware Acceleration for Block
D. evices
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
推荐试题
【判断题】
对烟囱、水塔类构筑物采用定向爆破拆除工程时,爆破拆除设计应控制建筑倒塌时的触地振动。
A. 对
B. 错
【判断题】
对烟囱、水塔类构筑物采用定向爆破拆除工程时,爆破拆除设计不用控制建筑倒塌时的触地振动。
A. 对
B. 错
【判断题】
爆破拆除工程应根据周围环境条件、拆除对象类别、爆破规模,分为A、B、C三级。
A. 对
B. 错
【判断题】
爆破拆除工程应根据周围环境条件、拆除对象类别、爆破规模,不用分为A、B、C三级。
A. 对
B. 错
【判断题】
拆除工程施工过程中,当发生重大险情或生产安全事故时,应及时排除险情、组织抢救、保护事故现场,并向有关部门报告。
A. 对
B. 错
【判断题】
拆除工程施工过程中,当发生重大险情或生产安全事故时,应及时排除险情、组织抢救、不用保护事故现场,向有关部门报告。
A. 对
B. 错
【判断题】
输电线路电压在1~2kV,桩架与输电线路间的安全距离应为1.5m以上。
A. 对
B. 错
【判断题】
施工现场应按地基承载力不少于65kPa的要求进行整平压实。
A. 对
B. 错
【判断题】
连墙件在脚手架中的作用是:不论有风无风均受力,既承传水平风荷载,又承传因约束脚手架平面外变形所产生的水平力。
A. 对
B. 错
【判断题】
作用于脚手架上的风荷载标准值WK的大小与以下因素有关:工程所在地区的基本风压W0、风压高度变化系数μZ、风荷体型系数μS。
A. 对
B. 错
【判断题】
对脚手架立杆接长的规定是:除顶层顶步外,其余各层各步必须采用搭接连接。
A. 对
B. 错
【判断题】
扣件拧紧扭力矩应控制在40~65N·m的范围内。
A. 对
B. 错
【判断题】
在水平杆的强度计算中,不计算水平杆的抗剪强度是由于水平杆抗剪承载力很大,不会发生剪切破坏。
A. 对
B. 错
【判断题】
扣件拧紧扭力矩不应小于40N·m,主要是因为拧紧扭力矩过小,会使脚手架的整体刚度过低,降低了脚手架的整体稳定性。
A. 对
B. 错
【判断题】
暴风雪及台风暴雨后,应对高处作业安全设施逐一加以检查。发现有松动、变形、损坏或脱落等现象,应立即修理完善。
A. 对
B. 错
【判断题】
对邻近的人与物有坠落危险性的其他竖向孔、洞口,均应予以盖没或加以防护,并有固定其位置的措施。
A. 对
B. 错
【判断题】
防护棚搭设与拆除时,应设警戒区,并应派专人监护,可以上下同时拆除。
A. 对
B. 错
【判断题】
攀登和悬空高处作业人员以及搭设高处作业安全设施的人员,必须经过上岗培训,并定期进行体格检查。
A. 对
B. 错
【判断题】
临边防护栏杆中,钢管横杆及栏杆均采用符合要求的管材,以扣件或电焊固定。
A. 对
B. 错
【判断题】
采用人字梯作业时,只有高级工可以站在梯子上移动梯子或在最顶层作业。
A. 对
B. 错
【判断题】
悬挑式钢平台的搁支点与上部拉结点,宜设置在脚手架等施工设施上。
A. 对
B. 错
【判断题】
结构施工自二层起,凡人员进出的通道口宜视情况搭设安全防护棚,高度超过24m的层次必须搭设安全防护棚。
A. 对
B. 错
【判断题】
施工前,应逐级进行安全技术教育及交底,落实所有安全技术措施和人身防护用品,未经落实时不得进行施工。
A. 对
B. 错
【判断题】
井架与施工用电梯和脚手架等与建筑物通道的两侧边,必须设防护栏杆。
A. 对
B. 错
【判断题】
有效高处作业重大危险源识别和控制清单就可以了。
A. 对
B. 错
【判断题】
施工现场用电工程的二级漏电保护系统中,漏电保护器可以分设于分配电箱和开关箱中。
A. 对
B. 错
【判断题】
需要三相四线制配电的电缆线路必须采用五芯电缆。
A. 对
B. 错
【判断题】
配电箱和开关箱中的N、PE接线端子板必须分别设置。其中N端子板与金属箱体绝缘;PE端子板与金属箱体电气连接。
A. 对
B. 错
【判断题】
配电箱和开关箱中的隔离开关可采用普通断路器。
A. 对
B. 错
【判断题】
配电箱和开关箱中的隔离开关可采用具有可见分断点的断路器。
A. 对
B. 错
【判断题】
总配电箱总路设置的漏电保护器必须是三极四线型产品。
A. 对
B. 错
【判断题】
需要三相四线制配电的电缆线路可以采用四芯电缆外加一根绝缘导线替代。
A. 对
B. 错
【判断题】
施工现场停、送电的操作顺序是:送电时,总配电箱→分配电箱→开关箱;停电时,开关箱→分配电箱→总配电箱。
A. 对
B. 错
【判断题】
用电设备的开关箱中设置了漏电保护器以后,其外露可导电部分可不需连接PE线。
A. 对
B. 错
【判断题】
一般场所开关箱中漏电保护器的额定漏电动作电流应不大于30mA,额定漏电动作时间不应大于0.1s。
A. 对
B. 错
【判断题】
分配电箱的总路和各分路均可只设分断时具有可见分断点的断路器。
A. 对
B. 错
【判断题】
乙炔瓶在储存或使用时可以水平放置。
A. 对
B. 错
【判断题】
乙炔瓶在储存或使用时严禁水平放置。
A. 对
B. 错
【判断题】
乙炔瓶内气体不得用尽,必须保留不小于98kPa的压强。
A. 对
B. 错
【判断题】
乙炔瓶内气体不得用尽,不用保留不小于98kPa的压强。
A. 对
B. 错