【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
A
解析
暂无解析
相关试题
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
【单选题】
Which is the block size on the VMFS6 datastore?___
A. All small and large file blocks are 8MB.
B. All small and large file blocks are 1MB.
C. Small file blocks are 512KB. large file blocks are 64MB.
D. Small file blocks are 1MB, large file blocks are 512MB.
【单选题】
When installing vCenter Converter Standalone, why must an administrator perform a client-server installation instead of a local installation?___
A. to manage conversion tasks remotely
B. to convert virtual machines as well as physical machines
C. to allow installation of the Converter agent on remote source machines
D. to hot clone physical or virtual machines
【单选题】
Which is required by vCenter Converter Standalone to convert a physical Red Hat Enterprise Linux 7 machine to a virtual machine?___
A. The Linux machine must be powered off.
B. The Linux machine must have the SSH daemon started.
C. The Linux machine must use a static IP address.
D. The Linux machine must have a fully-qualified domain name.
【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
【单选题】
An administrator has enabled vSphere Distributed Switch Health Check. The hosts connected to that Distributed Switch all display an alert:< vSphere Distributed Switch MTU supported status > .The administrator has all of the VMkernel ports MTU sizes set to 1600. Which action will remedy this problem?___
A. Configure the Distributed Switch to MTU 9100.
B. Disconnect and reconnect the physical network cable.
C. Configure the physical switch to MTU 1600.
D. Disable the Distributed Switch MTU.
【单选题】
Which Host Profile Subprofile configuration is used to configure firewall settings for ESXi hosts?___
A. Advanced Configuration Settings
B. General System Settings
C. Security
D. Networking
【单选题】
Where would a vSphere administrator find general vCenter Server logs on a vCenter Server Appliance?___
A. /var/log/vmware/vpxd/
B. /var/log/messages
C. /etc/vmware-vpx/
D. /var/log/vmware/vsan-health/
【单选题】
An administrator wishes to enable network port mirroring based on source port. Which feature should be enabled?___
A. vSphere standard switch port
B. ERSPAN
C. NSX Virtual Wire
D. VLAN
【单选题】
Which CLI command shows the physical uplink status for a vmnic?___
A. esxcli network ip connection list
B. esxcli network ip neighbor list
C. esxcli network nic get
D. esxcli network nic list
【单选题】
Which is the maximum number of block devices (LUNs) that are supported by ESXi hosts that are running version 6.5?___
A. 1024
B. 512
C. 2048
D. 256
【单选题】
When performing a vCenter Server 5.5 for Windows with Microsoft SQL Server Express database migration to vCenter Server Appliance 6.5, which will be the target database?___
A. Microsoft SQL Server Express 2012R2
B. Microsoft SQL Server Standard 2012R2
C. PostgreSQL
D. Oracle DB 11g
【单选题】
An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the vCenter Server systems. Which action should the administrator take to resolve the issue?___
A. Unmount the datastore and then enable SIOC on the vCenter Server system.
B. Configure the datastore to be managed by a single vCenter Server system.
C. Configure Storage DRS and then enable SIOC on the vCenter Server system.
D. Enable Raw Device Mapping (RDM) on the
E. SXi hosts.
【单选题】
“OneAppServer” is a VM template stored in a content library named “LibraryOne”, but the vSphere administrator is not able to use this template for deployment. Why is the administrator unable to deploy OneAppServer?___
A. OneAppServer must be updated before it can be deployed.
B. LibraryOne is a subscribed library and OneAppServer is not downloaded yet.
C. LibraryOne is published and optimized for syncing over HTTP.
D. OneAppServer was imported from a local file on the system.
【单选题】
An administrator sets the Failover Capacity for both CPU and Memory at 25%. Based on the Exhibit below, how much of the cluster’s total CPU resources are still available to power on additional virtual machines?___
A. 45%
B. 25%
C. 70%
D. 60%
【单选题】
Which statement applies to the vSphere Replication appliance?___
A. Only one vSphere Replication appliance can be deployed per vCenter Server instance.
B. VMware Tools in the vSphere Replication appliance can be upgraded.
C. A single vSphere Replication appliance can manage a maximum of 4000 replications.
D. vSphere Replication is available only with the vSphere
E. ssentials Plus license.
【单选题】
Which esxcli namespace can a vSphere Administrator use to adjust the queue depth?___
A. esxcli system module parameters
B. esxcli storage core device
C. esxcli system module set
D. esxcli storage core adapter
【单选题】
Which statement regarding datastore clusters meets VMware’s recommended best practices?___
A. Clusters should contain only datastores presented from the same storage array.
B. Clusters should contain only datastores with equal hardware acceleration capability.
C. Clusters should contain only datastores with the same capacity.
D. Clusters should contain only datastores using the same connection method (iSCSI, FC, etc.).
【单选题】
What VM Monitoring setting would ensure that the maximum reset window for a virtual machine is 24 hours?___
A. Medium
B. Low
C. High
D. Normal
【单选题】
What is the default space threshold for vSphere Storage DRS?___
A. 80%
B. 70%
C. 90%
D. 95%
【单选题】
Which is the correct sequence to upgrade a vSphere infrastructure?___
A. vCenter Server>ESXi host> VMware Tools>VM compatibility
B. ESXi host>vCenter Server> VMware Tools>VM compatibility
C. vCenter host> ESXi host> VM compatibility> VMware Tools
D. ESXi host>vCenter Server> VM compatibility>VMware Tools
【单选题】
An administrator has a large boot from SAN cluster and wants to ensure consistent configuration by using host profiles. What special considerations are required for boot from SAN hosts?___
A. Change the “Device is shared clusterwide” setting to “false” in the host profile.
B. Verify that the boot LUN is correctly identified as the boot device in the host profile.
C. The boot from SAN device must report as a local device.
D. Host profiles are incompatible with boot from SAN hosts.
【单选题】
When using VMware Converter to import a Windows server and improve the consistency of the destination virtual machine, which optional step can be performed immediately prior to powering down the source server?___
A. Perform a final synchronization task.
B. Remove the server from the network.
C. Uninstall production applications.
D. Remove the server from the Active Directory domain.
【单选题】
Restoration of the vCenter Server Appliance is accomplished using which interface?___
A. vSphere Web Client
B. vSphere Client
C. vCenter Server Appliance Management Interface
D. vCenter Server Appliance GUI Installer
【单选题】
When attempting to migrate a virtual machine to another host in the same cluster, the error message, “Select a valid compute resource” returns. What could cause this error?___
A. Both hosts run different versions of ESXi.
B. Both hosts are not sharing the same datastore.
C. VMware Tools is not installed.
D. Virtual machine has an ISO attached.
【单选题】
When will vSphere Data Protection delete the expired backup image of a Platform Service Controller?___
A. Immediately after the retention period has expired.
B. After the expired backup image is restored.
C. During the next backup window following expiry.
D. During the next maintenance window following expiry.
【单选题】
Group A has permission to download files in Content Library. Group B does not have permission to download files in Content Library. If a user is a member of both groups, what will be the result?___
A. The user cannot download file from Content Library.
B. The user can download file from Content Library.
C. The user cannot access Content Library.
D. The user can access Content Library.
【单选题】
An administrator is trying to set up Host Partial Failure Response, but the Automated option is grayed out. What can the administrator change to enable the Automated option?___
A. Change the vSphere DRS Automation level to Partially Automated.
B. Change the vSphere DRS Automation level to Fully Automated.
C. Enable vSphere HA Host Monitoring.
D. Change the vSphere DPM Automation level to Automatic.
【单选题】
When you attempt to open a virtual machine console from the vSphere Web Client, the console does not connect. The following error message appears:<HTTP ERROR 404> <Problem accessin/.Reason: Not Found>. Why did not connect?___
A. Port 443 is in use.
B. Port 9443 is in use.
C. Port 8443 is in use.
D. Port 22443 is in use.
【单选题】
What new feature was introduced to the Content Library in vSphere 6.5?___
A. Mount an ISO directly from the Content Library.
B. Deploy a virtual machine from an OVF Package in a Content Library.
C. Upload a File from a URL to a Library Item.
D. Upload a File from a Local System to a Library Item.
【单选题】
How can an administrator exclude Encryption rights from a support engineer?___
A. Clone the role Virtual machine power user, remove Cryptographic operations privileges.
B. Clone the role Administrator and assign to the support engineer.
C. Clone the role Virtual machine power user and assign to the support engineer.
D. Clone the role No cryptography administrator and select privileges only for the support engineer.
【单选题】
The administrator must back up a vCenter HA deployment. Which component must be backed up?___
A. Passive node
B. Witness node
C. External database
D. Active node
推荐试题
【多选题】
以下开标程序中正确的是( ) ___
A. 开标由工作人员主持,邀请所有投标人参加
B. 开标时间即为提交投标文件截止时间
C. 投标文件经确认无误后,由工作人员当众拆封
D. 开标时应当当众拆封、宣读所有有效投标文件
【多选题】
综合单价是由若干个计算出的项目的单价构成,计算正确公式为( ) ___
A. 项目基价=定额人工费+定额材料费+定额机械费
B. 材料费=∑(定额项目材料用量×材料市场价格)
C. 材料费=∑(定额项目材料用量×材料预算价格)
D. 人工费=定额项目工日数×综合平均日工资标准
【多选题】
工程变更是新增名词。建设工程合同是基于合同签订时静态的发承包范围、设计标准、施工条件为前提的,由于工程建设的不确定性,这种静态前提往往会被各种变更所打破。在合同工程实施过程中,工程变更可分为() ___
A. 设计图纸发生修改
B. 招标工程量清单存在错、漏
C. 对施工工艺、顺序和时间的改变
D. 为完成合同工程所需要追加的额外工作等
【多选题】
下列关于建设项目竣工财务决算审批表的说法,正确的是( )。 ___
A. 小、中、大型项目均按同种要求填报此表
B. 建设性质按照新建、改建、扩建等分类填列
C. 主管部门指建设单位的主管部门
D. 部分建设项目不须经过开户银行签署意见后再进行报批
E. 已具备竣工验收条件的项目三个月内不办理竣工验收等手续,视同项目已正式投产
【多选题】
招标工程量清单编制的准备工作包括( )。 ___
A. 对各种资料进行研究,为工程量清单的编制做准备
B. 工现场踏勘,了解施工现场及工程特点
C. 估算工程整体工程量
D. 拟定施工顺序
E. 确定工程量清单底价
【多选题】
下列费用中应计入到设备运杂费的有 ___
A. 设备保管人员的工资
B. 设备采购人员的工资
C. 设备自生产厂家至工地仓库的运费、装卸费
D. 运输中的设备包装支出
E. 设备仓库所占的固定资产使用费
【多选题】
中标人不按照与招标人订立的合同履行义务,情节严重的,将受到( )处罚。 ___
A. 取消其2至5年内参加依法必须进行招标的项目的投标资格
B. 对取消投标资格予以公告
C. 对其直接负责的主管人员和其他直接责任人员处以项目金额5%以上10%以下的罚款
D. 由工商行政管理机关吊销营业执照
E. 降低资质等级,吊销资质证书
【多选题】
关于建设用地取得及费用,下列说法中正确的有( )。 ___
A. 通过出让获得国有土地使用权的方式有招标、拍卖、挂牌和协议
B. 工业、商业、旅游、娱乐用地的土地使用权出让最长年限为40年
C. 以划拨方式取得的土地使用权,因企业改制不再符合划拨用地目录,应实行有偿使用
D. 通过市场机制获得的土地使用权,不再承担征地补偿费或拆迁补偿费
E. 搬迁补助费的标准,由各省、自治区、直辖市人民政府规定
【多选题】
根据我国现行建筑安装工程费用项目组成规定,下列施工企业发生的费用中,应计入企业管理费的是( ) ___
A. 建筑材料、构件一般性鉴定检查费
B. 支付给企业离休干部的经费
C. 施工现场工程排污费
D. 履约担保所发生的费用
E. 施工生产用仪器仪表使用费
【多选题】
关于工程量清单计价和定额计价,下列计价公式中正确的有( ) ___
A. 单位工程直接费=∑(假定建筑安装产品工程量×工料单价)+措施费
B. 单位工程概预算费=单位工程直接费+企业管理费+利润+税金
C. 分部分项工程费=∑(分部分项工程量×分部分项工程综合单价)
D. 措施项目费=∑按项计算的措施项目费+∑(措施项目工程量×措施项目综合单价)
E. 单位工程报价=分部分项工程费+措施项目费+其他项目费+规费+税金
【多选题】
关于材料单价的构成和计算,下列说法中正确的有( ) ___
A. 材料单价指材料由其来源地运达工地仓库的入库价
B. 运输损耗指材料在场外运输装卸及施工现场内搬运发生的不可避免损耗
C. 采购及保管费包括组织材料检验、供应过程中发生的费用
D. 材料单价中包括材料仓储费和工地管理费
E. 材料生产成本的变动直接影响材料单价的波动
【多选题】
下列文件中,包括在建设项目总概算文件中的有( ) ___
A. 总概算表
B. 单项工程综合概算表
C. 工程建设其他费用概算表
D. 主要建筑安装材料汇总表
E. 分年投资计划表
【多选题】
根据《建筑安装工程费用项目组成》(建标[2013]44号)文件的规定,关于建筑安装工程费用项目构成中税金的综合税率,下列说法正确的是( )。 ___
A. 纳税地点在市区的企业综合税率为3.48%
B. 纳税地点在县城的企业综合税率为3.41%
C. 纳税地点在镇的企业综合税率为3.28%
D. 纳税地点不在市区、县城、镇的企业综合税率为3.28%
E. 实行营业税改增值税的,按纳税地点现行税率计算
【多选题】
关于最终结清付款,下列说正确的是( )。 ___
A. 发包人应在签发最终结清支付证书后的14天内,按照最终结清支付证书列明的金额向承包人支付最终结清款
B. 最终结清时,如果承包人被扣留的质量保证金不足以抵减发包人工程缺陷修复费用的,承包人应承担不足部分的补偿责任
C. 发包人未按期支付的,承包人可催告发包人在合理的期限内支付,但无权获得延迟支付的利息
D. 最终结清付款后,承包人在合同内享有的索赔权利也自行终止
E. 承包人对发包人支付的最终结清款有异议的,按照合同约定的争议解决方式处理
【多选题】
按照费用构成要素划分的建筑安装工程费用项目组成规定,下列费用项目应列入材料费的有( )。 ___
A. 周转材料的摊销、租赁费用
B. 材料运输损耗费用
C. 施工企业对材料进行一般鉴定、检查发生的费用
D. 材料运杂费中的增值税进项税额
E. 材料采购及保管费用
【多选题】
下列与项目建设有关的其他费用中,属于建设管理费的有( )。 ___
A. 建设单位管理费
B. 引进技术和引进设备其他费
C. 工程监理费
D. 场地准备费
E. 工程总承包管理费
【多选题】
关于工程量清单计价的基本程序和方法,下列说法正确的有( )。 ___
A. 单位工程造价通过直接费、间接费、利润汇总
B. 计价过程包括工程量清单的编制和应用两个阶段
C. 项目特征和计量单位的确定与施工组织设计无关
D. 招标文件中划分的由投标人承租的风险费用列入综合单价中
E. 工程量清单计价活动伴随竣工结算而结束
【多选题】
为有利于措施费的确定和调整,根据现行工程量计算规范。适宜釆用单价措施项目计价的有( )。 ___
A. 夜间施工增加费
B. 二次搬运费
C. 施工排水、降水费
D. 超高施工增加费
E. 垂直运输费
【多选题】
根据现行建筑安装工程费用项目组成规定,下列费用项目中已包括在人工日工资单价内的有( )。 ___
A. 节约奖
B. 流动施工津贴
C. 高温作业临时津贴
D. 劳动保护费
E. 探亲假期间工资
【多选题】
在编制单位建筑工程施工图预算时,一般应计入综合取定的措施项目费的有( )。 ___
A. 施工降水费用
B. 冬雨季施工增加费
C. 夜间施工增加费
D. 模板费用
E. 脚手架费用
【多选题】
根据《建设工程施工合同(示范文本)》(GF-2013-0201),下列事项应纳入工程变更范围的有( )。 ___
A. 改变工程的标高
B. 改变工程的实施顺序
C. 提高合同中的工作质量标准
D. 将合同中的某项工作转由他人实施
E. 工程设备价格的变化
【多选题】
根据财政部、国家发改委、住建部的有关文件,竣工结算的组成文件包括( ) ___
A. 工程竣工验收报告
B. 工程竣工图
C. 设计概算施工图预算
D. 工程竣工结算
E. 工程竣工造价对比分析