【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
B
解析
暂无解析
相关试题
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
推荐试题
【单选题】
调度集中区段的两端站、编组站、区段站,以及调车作业较多、有去往区间岔线列车或中途返回补机的中间站,可不列入调度集中操纵,但___均应受调度集中控制。[932000000]
A. 进站信号机
B. 调车信号机
C. 通过信号机
D. 出站信号机
【单选题】
任何单位和个人不得在地下光(电)缆两侧各___ 的范围内挖砂、取土和设置可能引起光(电)缆腐蚀的设施。[933000000]
A. 0.5m
B. 1m
C. 2m
D. 2.5m
【单选题】
《中华人民共和国铁路法》规定对损毁、移动铁路信号装置及其他行车设施或者在铁路线路上放置障碍物说法正确的是___。[913000000]
A. 铁路职工无权制止
B. 铁路职工有权制止,不能扭送公安机关处理
C. 铁路职工有权制止,可以扭送公安机关处理
D. 铁路职工无权制止,可以通知公安机关处理
【单选题】
《中华人民共和国铁路法》规定对在铁路线路两侧___以内或者铁路防护林地内放牧的,铁路职工有权制止。[913000000]
A. 10m
B. 20m
C. 30m
D. 40m
【单选题】
事故涉及两个以上单位管理的相关设备,设备质量均未超过临修或技术限度时,按事故___进行推断,确定责任单位。[933000000]
A. 因果关系
B. 发生时间
C. 持续时间
D. 组织抢险
【单选题】
事故调查组未及时通知有关单位接受事故调查,不得定有关单位责任,有关单位接到通知后,应派员而未派员接受事故调查的,事故调查组___定责。[931000000]
A. 免予直接
B. 不再直接
C. 可以直接
D. 无法直接
【单选题】
电务部门应加强安全基础建设,强化专业技术管理,严格执行规章制度、技术标准和操作规程,认真落实___作业程序,保证行车、设备及人身安全。[921000000]
A. 标准化
B. 计算机
C. 自动控制
D. 行车作业
【单选题】
信号设备、器材实行寿命管理,已达到寿命期的信号设备和器材不得继续使用,主要设备和器材实行___集中销毁制度。[913000000]
A. 统一销售
B. 统一回收
C. 统一转运
D. 统一分配
【单选题】
信号联锁管理是信号技术管理的重点,信号设备维护及各类工程改造,必须严格执行联锁管理有关规定,严禁擅自改变___联锁软件等。[921000000]
A. 轨道电路
B. 信号机构
C. 道岔表示
D. 电路结构
【单选题】
设备和器材投入使用前,电务段必须按标准对产品技术性能、___及外观等进行检查、测试,合格的方可使用。[911000000]
A. 技术指标
B. 说明书
C. 集装箱
D. 生产厂家
【单选题】
对应急设备、器材的管理,应建立应急设备、器材管理制度和台账,明确备用型号及数量、___及位置等,定期进行检查,保证其处于良好状态。[921000000]
A. 使用地点
B. 使用时间
C. 维修地点
D. 存放地点
【单选题】
违章作业是造成电务重大、大事故及险性事故的主要原因,必须提高电务职工的法律意识和安全意识,加强维修、施工、故障处理等关键环节的控制,落实安全___,杜绝违章作业。[921000000]
A. 报警措施
B. 检修方法
C. 卡控措施
D. 施工计划
【单选题】
电务部门各单位应对全体职工进行安全生产教育和培训,使其具备必要的安全生产知识,熟悉有关安全生产规章制度和安全操作规程,掌握本岗位安全___,培训考试不合格的职工,不得上岗作业。[921000000]
A. 培训技能
B. 调车技能
C. 操作技能
D. 考试规则
【单选题】
新职工及转岗、复工、改职人员必须经过行车安全和人身安全教育和___,考试合格,方可上岗。[911000000]
A. 联劳协作
B. 部门配合
C. 办理行车
D. 专业培训
【单选题】
当发生与信号设备有关联的机车车辆冲突、脱轨事故时,信号维修人员应会同车站值班员记录设备状态,派人监视,保护___,不得擅自动用设备,并立即报告电务段调度。[923000000]
A. 事故现场
B. 测试现场
C. 施工现场
D. 检修现场
【单选题】
对影响行车的设备故障,信号维修人员应将确认的故障现象以及故障原因、___登记在《行车设备检查登记簿》内,作为原始记录备查。[931000000]
A. 行车组织
B. 处理情况
C. 行车管理
D. 调车组织
【单选题】
信号工区是负责现场信号设备维修工作的基本生产组织,承担管内信号设备日常养护和集中检修工作,实行昼夜值班制度,及时处理___。[911000000]
A. 行车作业
B. 调车作业
C. 设备故障
D. 发车作业
【单选题】
专业工区是负责信号设备、器材入所修工作的基本生产单位,承担管内信号入所修设备、器材的___。[922000000]
A. 施工组织
B. 检修工作
C. 测试计划
D. 抢险预案
【单选题】
天窗是指铁路列车运行图中不铺划列车运行线或调整、抽减列车运行线为营业线施工、___预留的时间。[913000000]
A. 安装信号机
B. 测试残压
C. 安装道岔
D. 维修作业
【单选题】
凡影响营业线行车的维修作业均应纳入天窗,不准利用列车间隔进行,天窗内无法完成的维修作业,必须纳入铁路局(公司) ___计划。[922000000]
A. 月度施工
B. 季度施工
C. 年度行车
D. 月度行车
【单选题】
维修工作计划应根据 “信号设备维修工作内容及周期表”、“信号设备器材入所修更换周期及检修工时定额表”规定的内容和周期及___作业计划编制。[933000000]
A. 行车作业
B. 维修天窗
C. 轨道调试
D. 道岔施工
【单选题】
工区应实行岗位责任制,信号工对分管的设备质量与安全负责,并应遵守各项规章制度,严格执行标准化程序,杜绝___。[913000000]
A. 违章调车
B. 违章接车
C. 违章发车
D. 违章作业
【单选题】
工区应认真做好基础管理工作,做到___、填记及时、记载准确、保管完好,并应健全民主管理制度,做到事事有人管,人人有其责。[921000000]
A. 有学习资料
B. 资料齐全
C. 有测试资料
D. 计划齐全
【单选题】
必须认真执行铁道部关于营业线施工的安全管理规定和《铁路信号维护规则》关于施工安全的规定,凡影响设备正常使用和___的施工作业必须安排在天窗内进行。[933000000]
A. 调车安全
B. 客车安全
C. 行车安全
D. 发车安全
【单选题】
施工单位提报的施工计划、安全协议书所包含的内容应符合相关文件规定,未签订___协议或协议未经审查的严禁施工。[921000000]
A. 联锁关系
B. 验收方法
C. 测试方法
D. 施工安全
【单选题】
大修工程竣工后,施工单位必须确认工程已按设计工作量完成,质量符合规定的技术标准,并提供完整的竣工文件,经施工单位自验、电务段初验合格后,提出___,请求验收。[921000000]
A. 请验报告
B. 施工措施
C. 安全措施
D. 技术措施
【单选题】
测试是信号设备维护工作的重要内容之一,通过测试,掌握和分析设备___,指导维护工作,预防设备故障,保证设备正常运用。[932000000]
A. 运行时间
B. 调车组织
C. 行车组织
D. 运用状态