【多选题】
Which three are supported upgrade processes for ESXi host? (Choose three.)___
A. using vSphere Auto Deploy
B. using a TFTP server
C. using Update Manager
D. using an
E. SXCLI command
查看试卷,进入试卷练习
微信扫一扫,开始刷题

答案
ACD
解析
暂无解析
相关试题
【多选题】
When enabling Storage DRS on a datastore cluster, which three components are enabled as a result? (Choose three.)___
A. Space load balancing among datastore within the datastore cluster.
B. Initial placement for virtual disks based on space and I/O workload.
C. I/O load balancing among datastores within the datastore cluster.
D. Queue Depth alerting on disks within the datastore cluster.
E. Data de-duplication within the datastore cluster.
【多选题】
What are two features introduced in Network I/O Control version 3? (Choose two.)___
A. Bandwidth reservation per traffic type
B. Network resource pools
C. CoS tagging
D. Bandwidth guarantee to virtual machines
【多选题】
Which two correct virtual machine advanced configuration parameters will accomplish this? (Choose two.)___
A. isolation.device.edit.disable = “FALSE”
B. isolation.device.edit.disable = “TRUE”
C. isolation.device.connectable.disable = “FALSE”
D. isolation.device.connectable.disable = “TRUE”
【多选题】
Which three statements are correct regarding booting an ESXi Host from Fibre Channel SAN? (Choose three.)___
A. Direct connect topology is supported.
B. Each host must have its own boot LUN.
C. ESXi hosts do not require local storage.
D. Multipathing to a boot LUN on an active-passive array is supported.
E. Hosts can share one common boot LUN.
【多选题】
Which two tasks should a vSphere administrator perform if the vmkernel log reports VMFS metadata errors? (Choose two.)___
A. contact VMware technical support
B. reformat the datastore
C. check the device with VOMA
D. ignore the messages
【多选题】
Which two statements are true for a vCenterServer user account that is used for vSphere Data Protection (VDP)? (Choose two.)___
A. The user account must be assigned with Administrator role.
B. The password for the user account cannot contain spaces.
C. The user account should be created in the Single Sign-On domain
D. The user account cannot inherit required permissions from a group role.
【多选题】
Which three storage protocols are supported by Virtual Volumes? (Choose three.)___
A. FCIP
B. FCoE
C. iSCSI
D. NFS v3
E. NFS v4
【多选题】
A vSphere administrator observes a CPU spike on one of the web servers (view the Exhibit.) Which two statements can describe the cause of this activity? (Choose two.)___
A. The network packet size is too large.
B. VMware Tools is not installed.
C. Disk latency is present on the datastore.
D. The network packet size is too small.
【多选题】
Which three operations can cause VMFS metadata updates? (Choose three.)___
A. Restarting a VM using the guest OS.
B. Launching a VM console.
C. Migrating a VM with vMotion.
D. Powering a VM on or off.
E. Expanding a VMFS datastore.
【多选题】
*What two services run on all nodes in a vCenter Server HA cluster? (Choose two.)___
A. vmware-vmon
B. vmware-vpostgres
C. vmare-rbd-watchdog
D. vmware-vcha
【多选题】
Which two statements are true regarding Auto Deploy in version 6.5? (Choose two.)___
A. Auto Deploy can be configured and managed via PowerCLI.
B. Auto Deploy can be configured and managed via the vSphere Client.
C. Auto
D. eploy can be configured and managed via the vSphere Web Client.
【多选题】
What three options can improve network performance for a virtual machine? (Choose three.)___
A. MLD
B. TSO
C. NetFlow
D. LRO
E. SR-IOV
【多选题】
Which two storage technologies are supported for MSCS? (Choose two.)___
A. NFS
B. VAAI
C. iSCSI
D. FC
【多选题】
When upgrading a VMware vSAN cluster to version 6.5, which two tasks must be completed to comply with upgrade requirements and VMware-recommended best practices? (Choose two.)___
A. Use RVC to upgrade the hosts.
B. Use the latest available ESXi version.
C. Back up all VMs.
D. Use only the “Full data migration” maintenance mode option.
【多选题】
What two enhancements are in VMFS6 but not in VMFS5? (Choose two.)___
A. Support for 4k native disks
B. Support for 512e disks
C. GPT storage device partitioning
D. Automatic space reclamation
【多选题】
Which two statements describe why a vSphere DRS cluster would report load imbalance? (Choose two.)___
A. The configured migration threshold is too high.
B. The configured migration threshold is too low.
C. DRS is configured for Partially Automated.
D. Enhanced vMotion Compatibility (EVC) is enabled.
【多选题】
A vSphere Administrator must ensure that vCenter Server service is running in a domain user account rather than Local System Account. To accomplish this, the user account should have which two permissions? (Choose two.)___
A. Log on as a service.
B. Act as part of the operating system.
C. Log on as a batch job.
D. Log on locally.
【多选题】
A virtual machine fails to power on after being deployed from a template. What two remediation steps could correct this issue? (Choose two.)___
A. Increase CPU reservation
B. Decrease memory reservation
C. Increase memory reservation
D. Increase datastore capacity
E. Decrease CPU reservation
【多选题】
Which three directories are available under the vcsa-cli-installer folder of the vCenter Server Appliance installation media? (Choose three.)___
A. \mac
B. \ovftool
C. \migration-assistant
D. \win32
E. \lin64
【多选题】
What are three considerations when booting ESXihost from SAN software FCoE? (Choose three.)___
A. The VMware_FCoE_vSwitch that the installer automatically created cannot be changed.
B. Boot LUN cannot be shared with other hosts even on shared storage.
C. Multipathing is not supported at pre-boot.
D. Software FCoE boot configuration cannot be changed from within
E. SXi.
【多选题】
Which two choices are applicable to vSphere Availability? (Choose two.)___
A. Heartbeat Datastores
B. VM Startup/Shutdoown
C. Power Management
D. Admission Control
【多选题】
A user is a member of groups A and B. -VM10 and VM20 are in VM Folder. -Group A is assigned permission “Read-only” on VM Folder. What two configurations will allow the user to edit the settings for only VM10? (Choose two.)___
A. Assign group B permission “virtual machine power user” to VM10.
B. Assign group B permission “virtual machine console user” to VM10.
C. Assign group A permission “virtual machine console user” to VM10.
D. Assign group A permission “virtual machine power user” to VM10.
【多选题】
Which two new vSphere 6.5 features enable an Administrator to locate configuration options when creating or editing host profiles more easily than in previous versions? (Choose two.)___
A. Add the configuration option to favorites.
B. Navigate the option tree.
C. Search for the configuration option.
D. Copy the configuration option from a different profile.
【多选题】
What are the two valid storage controller types for VMs on ESXi 6.5? (Choose two.)___
A. FCoE
B. SATA
C. NVMe
D. iSCSI
【多选题】
Which two options can optimize conversion with VMware Converter? (Choose two.)___
A. Disable real-time antivirus scanners.
B. Remove the source from Active Directory.
C. Remove third-party device drivers.
D. Exclude diagnostic partitions from conversion.
E. Disable Volume Shadow Copy (VSS).
【多选题】
vSphere Availability considers which two factors for virtual machine restarts? (Choose two.)___
A. Host Isolation Response
B. file accessibility
C. NUMA node size
D. resource reservations
【多选题】
Which two virtual NICs support Wake-on-Lan to resume a virtual machine that is in standby mode? (Choose two)___
A. Flexible
B. E1000E
C. E1000
D. vmxnet 3
【多选题】
Which two logs should be examined to troubleshoot a Windows vCenter Server upgrade failure? (Choose two.)___
A. vminst.log
B. vim-um-msi.log
C. firstboot.log
D. pkgmgr.log
【多选题】
Which are two supported storage primitives for VAAI NAS? (Choose two.)___
A. Full File Clone
B. Reserve Space
C. hardware assisted locking
D. block zeroing
【多选题】
Which two parameters must be configured for Windows in-guest disk mirroring? (Choose two.)___
A. scsi#.returnNoConnectDuringAPD = “FALSE”
B. scsi#.terminateVMOnPDL = “TRUE”
C. scsi#.returnBusyOnNoConnectStatus = “FALSE”
D. scsi#.returnNoConnectDuringAPD = “TRUE”
【多选题】
Which two items are required to enable NPIV in a virtual machine? (Choose two.)___
A. use of physical RDMs
B. physical HBA support
C. use of virtual disks
D. hardware version 11 or higher
【多选题】
A vSphere Administrator has VM Component Protection (VMCP) enabled, but the VM was not restarted when one of the VMFS datastores experienced an All Paths Down (APD) failure. What two scenarios would explain why the virtual machine was not restarted? (Choose two.)___
A. VM Monitoring is required in order for VMCP to failover during an APD event.
B. VMware Tools is not installed on the guest operating system for the VM.
C. Insufficient Capacity is available on the failover ESXi hosts.
D. The APD failure was corrected before the VM could be restarted.
【多选题】
What are two requirements in order to restore a Resource Pool Tree from a snapshot? (Choose two.)___
A. vSphere DRS must be turned on.
B. A restore can only be performed on a vSphere DRS cluster within the original vCenter Server.
C. vSphere
D. RS must be turned off.
【多选题】
Which three vSphere features are compatible with vSphere Replication? (Choose three.)___
A. vSphere High Availability
B. vSphere Fault Tolerance
C. vSphere Storage
D. RS
【多选题】
What two VMware Remote Console Options can be defined in the virtual machine settings? (Choose two.)___
A. Boot Delay
B. Maximum number of sessions
C. Guest OS lock
D. Total video memory
【多选题】
VMware Converter can import a powered off virtual machine from which two virtual machine platforms?(Choose two.)___
A. Microsoft Hyper-V
B. Citrix Xen
C. VMware Workstation
D. Linux with KVM
【多选题】
Which two options allow storage space reclamation? (Choose two.)___
A. Use VMFS6 datastores.
B. Use esxcli storage vmfs unmap.
C. Use the SAN console (management tool).
D. Use the vSphere Web Client.
【多选题】
An administrator must reprovision 25 hosts with a new image profile that he has created. Which two methods can the administrator use to change the image profile? (Choose two.)___
A. From the vSphere Web client home page, select the Deploy Rules tab in the Auto Deploy section.
B. Run the Copy-Deploy Rule and specify the Replace Item parameter with Power CLI.
C. From the vSphere Web client home page, select the Assign Rules tab in the Auto
D. eploy section.
【多选题】
What are three parameters for traffic filtering or marking? (Choose three.)___
A. Protocol
B. Traffic Direction
C. DSCP value
D. virtual Port ID
【多选题】
The vSphere administrator must change the path selection policy (PSP) to comply with best practices. Which two interfaces can be used to change the PSP? (Choose two.)___
A. ESXi shell
B. vSphere Client
C. ESXi host client
D. vSphere Web Client
推荐试题
【单选题】
CCF035一家组织中标获得一个大型施工项目项目经理得知该组织之前成功完成了一个类似的项目,希望利用该项目的经验教训。项目经理应该使用哪一种数据分析技术? ___
A. 文件分析。
B. 偏差分析。
C. 回归分析。
D. 趋势分析。
【单选题】
CCF036项目经理必须制定相关方参与计划,以避免相关方之间发生利益冲突。项目经理应该使用什么来执行相关方分析? ___
A. 执行、负责、咨询和知情(RACI)矩阵。
B. 计划-实施-检查-行动(PDCA)循环。
C. 数据收集技术。
D. 优势、劣势,机会与威胁(SWOT)分析。
【单选题】
CCF037项目经理领导着位于不同国家和时区的项目团队。在制定相关方参与计划时,项目经理必须考虑到几个相关方在范围和项目质量方面存在相互冲突的观点。项目经理首先应该做什么?___
A. 与每个相关方当面或远程会议以获得支持。
B. 聘请文化差异专家教练来制定解决该问题的策略。
C. 应用工具和技术来评估利益相关者的影响力、权利和影响。
D. 对文化差异执行风险评估,并相应更新风险登记册。
【单选题】
CCF038一个使用多个供应商的项目估计将在两年内完成。在第一年结束时,发现存在重大预算超支。项目经理意识到必须将项目重新拉回控制,因此签发一项变更请求。若要支持这项变更请求,项目经理应该做什么? ___
A. 更新变更控制过程。
B. 完成质量审计。
C. 召开风险研讨会。
D. 执行根本原因分析。
【单选题】
CCF039在准备状态报告时,项目经理发现完工估算(EAC)高于完工预算(BAC)。项目经理下一步应该做什么? ___
A. 将问题升级上报给项目发起人。
B. 减少范围,以符合 BAC。
C. 评估并在风险登记册中记录该风险。
D. 与团队开会,以解决该问题。
【单选题】
CCF040在一个关键项目中,一名重要的团队成员辞职。若要管理这种情况,项目经理首先应该做什么? ___
A. 将剩余的工作负荷分配给其他团队成员。
B. 通知项目相关方。
C. 审查风险管理和行动应对计划。
D. 确定该团队成员辞职的原因。
【单选题】
CCF041团队一直在努力按时交付任务,项目经理需要更好地了解潜在会延迟项目的可能性。项目经理应该查阅下列哪一份文件来分析这个问题? ___
A. 风险管理计划。
B. 问题日志。
C. 项目管理计划。
D. 工作绩效报告。
【单选题】
CCF042在项目实施过程中,营销部门通知项目经理说,产品的市场需求已经发生变化。之前未曾预料到这些变化,可能会显著影响调查的销售数量,并可能影响项目范围。项目经理应该怎么做? ___
A. 计划使用应急储备并更新风险减轻计划。
B. 使用挣值管理(EVM)方法。
C. 规划风险应对,并更新风险登记册。
D. 应用检测方法。
【单选题】
CCF043项目经理与项目相关方开会,获得关于如何最好地向施工现场输送用品的信息和知识。这使用的是哪种沟通方法类型? ___
A. 拉式沟通。
B. 推式沟通。
C. 交互式沟通。
D. 内部沟通。
【单选题】
CCF044一个国际团队被分配到一个项目上工作,项目经理担心由于文化差异可能会产生误解。项目经理应该使用什么来确保团队对项目目标达成共识? ___
A. 项目章程。
B. 责任分配矩阵。(RAM)
C. 相关方登记册。
D. 沟通管理计划。
【单选题】
CCF045项目经理正领导一支缺乏经验的项目团队,发现业务需求文件可能无法按时完成。由于这可能会影响下一个活动的开始,项目经理安排了额外资源来减少不确定性。项目经理下一步应该做什么? ___
A. 修改问题日志。
B. 更新风险登记册。
C. 执行定量风险分析。
D. 修订项目进度计划。
【单选题】
CCF046一名项目团队成员确定了一个简单的变更,可以在不影响项目预算的情况下提高产品质量。项目经理应该做什么? ___
A. 请求发起人对所提议的变更提出建议。
B. 在审查变更之后,将其包含在质量管理计划中。
C. 与团队成员开会,以评估影响,并遵循变更控制过程。
D. 让团队成员尽快将其包含在其分配的任务中。
【单选题】
CCF047在项目执行过程中,一名相关方希望知道谁有权分配项目资源。为了解决这个问题,项目经理应该怎么做? ___
A. 与该相关方一起审查项目资源管理计划。
B. 获得相关方的一致同意,并更新相关方登记册。
C. 与该相关方一起审查项目章程。
D. 与该相关方一起检查沟通管理计划。
【单选题】
CCF048一个相关方不同意一个项目功能的实施方式。项目经理首先应该做什么? ___
A. 将其升级上报给测试团队。
B. 要求该相关方签发一项变更请求。
C. 更新变更日志和风险登记册。
D. 将其记录在问题日志中。与该相关方一起检查沟通管理计划.
【单选题】
CCF049一个开发软件产品的项目包含几个不同的组件。在实施项目之前,项目经理审查了从之前的类似项目中汲取的经验教训。项目经理发现,质量保证团队经常要求开发团队对未达到验证标准的产品组件进行返工。项目经理应该在项目中加入什么来防止这种情况再发生? ___
A. 充足的质量保证团队资源,确保质量保证任务的执行更加高效。
B. 进度计划中的充足时间,来完成所需的开发和质量保证任务。
C. 质量管理计划,包含每个组件的开发任务、验收标准和质量保证任务。
D. 充足的开发团队资源,用于质量保证任务,确保以更高的质量交付产品。
【单选题】
CCF050由于缺乏相关方的支持,虽然项目和预算均已获得批准,但项目经理无法获得资源。项目经理应该做什么? ___
A. 将问题升级上报给上级管理层。
B. 执行相关方分析,并举行开工会议,让相关方参与其中。
C. 在下一次项目状态会议上要求相关方提供更好的支持。
D. 将问题和减轻计划添加到风险日志中,并通知发起人。
【单选题】
CCF051项目执行期间,客户请求进行一个小变更。在执行高层级审查后,开发人员确定进行变更所需的工作影响较小且可被吸收。项目经理下一步应该怎么做? ___
A. 更新问题日志。
B. 向所有项目相关方沟通提议的变更。
C. 要求开发人员继续进行修改。
D. 签发变更请求。
【单选题】
CCF052在开工会议期间,一些相关方对项目管理计划的不同方面提出异议,在解决所有异议后,项目团队收到对计划的支持,发起人和相关方承诺完全支持该项目。这属于下面哪一项的实例? ___
A. 精力充沛的相关方。
B. 有效的规划和沟通。
C. 高效的团队协作。
D. 相关方关系的复杂性。
【单选题】
CCF053项目经理从项目团队和供应商处收到一连串电子邮件,争论最近收到的一个可交付成果。项目团队认为该可交付成果未能满足特定需求,但供应商却坚持他们不知道这个需求。项目经理首先应该查阅哪份文件? ___
A. 需求管理计划。
B. 工作分解结构。(WBS)
C. 沟通管理计划。
D. 工作说明书。(SOW)
【单选题】
CCF054一个分包商虽然工作速度非常快,但却未能完成项目可交付成果的正式验收程序。客户的质量团队检查了可交付成果,并创建了一份很长的缺陷清单。 若要避免这个问题,项目经理应该事先做什么? ___
A. 经常与客户举行状态会议。
B. 让一个内部质量团队检査可交付成果。
C. 实施质量管理计划。
D. 要求客户提供原型。
【单选题】
CCF055一个项目正处于执行阶段,为了节省时间和获得奖金,团队成员希望快速交付一些已准备好的可交付成果,因此必须删去质量控制相关的任务。项目经理应该怎么做? ___
A. 完成项目,签发变更请求,并而请求一支新资源替换不合规的部分。
B. 向项目发起人和管理层报告该问题,防止支付效率奖金。
C. 让团队成员查阅质量管理计划并向项目发起人报告道德问题。
D. 将可能不满足客户要求的风险更新到风险登记册中。
【单选题】
CCF056一位高级经理要求项目经理向其发送项目总结。项目经理应该做什么? ___
A. 安排召开会议,以口头传达项目总结。
B. 请发起人发送项目总结。
C. 发送最新的项目状态报告,其中包括项目总结。
D. 向他们提供执行项目总结。
【单选题】
CCF057一些之前未识别到的相关方报告说,他们的职能领域受到很大影响,但没有持续通知他们关键项目的状态。项目经理首先应该做什么? ___
A. 确定沟通项目状态的新策略。
B. 邀请所有相关方参加状态会议。
C. 审查项目的沟通方法。
D. 检查并更新相关方登记册。
【单选题】
CCF058一家组织必须执行一个具有明确目标的项目,但由于缺乏知识,发现难以确定具体需求。项目经理应该做什么? ___
A. 创建并获得工作分解结构(WRS)的批准。
B. 建议推迟项目,直至可以定义更多规范为止。
C. 制定技术规范,以供发起人核实和批准。
D. 定义初步范围说明书,用于项目规划。
【单选题】
CCF059项目经理为一个具有按时完成盈利项目历史记录的组织工作。然而,由于缺乏相关方的支持以及他们未能提供信息,这些项目都经历过问题。若要避免这些问题,项目经理在新项目开始时应该做些什么? ___
A. 管理所有相关方的期望,并为每个人提供解决方案。
B. 准备一份包含所有相关方的沟通管理计划。
C. 在启动阶段识别关键相关方并进行优先级排序。
D. 复制之前项目的工作,因为这些项目结束时都很好。
【单选题】
CCF060为了帮助满足项目截止日期,一个相关方提交了一项修改执行过程的请求。项目经理应该做什么? ___
A. 査阅相关方登记册。
B. 暂时搁置这项请求,等到下一次发起人会议上讨论。
C. 评估这项变更对项目的影响。
D. 与团队一起讨论影响。
【单选题】
CCF061供应商建议项目经理,为了满足要求的规格,需要更换特定材料。为确保成本基准不受影响,项目经理应该审查下列哪一项? ___
A. 管理储备。
B. 应急储备。
C. 成本预测。
D. 挣值(EV)分析。
【单选题】
CCF062一个项目经理领导一个创新项目,该项目将为公司创造持久的价值。项目经理召开一次团队会议进行头脑风暴并细分项目的范围。在这次会议上,项目经理和团队应该做什么? ___
A. 产生工作分解结构(WBS).
B. 制定并向 WES 分配识别码。
C. 查看项目范围说明书。
D. 创建项目章程.
【单选题】
CCF063项目主管担心一个计划驱动的项目可能无法实现其完成日期。若要减轻这个问题,项目经理应该做什么? ___
A. 制定资源分解结构(RBS)。
B. 应用资源平衡。
C. 采用开始到开始(SS)任务关系来加速关键路径活动。
D. 重定进度基准和资源管理计划。
【单选题】
CCF064一个项目需要工程部门的专业技术知识。但是,高级工程师正在领导另一个单独项目的团队,唯一可用的资源是一位初级工程师。高级工程师受到客户的高度推崇,也受到项目经理的青睐。项目经理首先应该做什么才能让高级工程师参与这个项目? ___
A. 使用高级工程师的师资拟定工作描述,以聘请一位资质相当的高级工程师。
B. 立即要求项目发起人升级上报这项资源要求。
C. 与工程部门经理开会,讨论可让高级工程师参与的方案。
D. 要求分配高级工程师,以提高客户对交付优质产品的信息。
【单选题】
CCF065项目经理正在管理一个全球项目,其团队成员分散于多个国家。为简化项目状态更新,来自一个地区的经理启动了本地语言社交媒体账户。项目经理应该做什么? ___
A. 审计新的沟通渠道以确保其遵守 PMO 政策。
B. 要求这些经理传达新渠道内容的翻译版本。
C. 要求这些经理遵守项目管理办公室(PMO)的沟通政策。
D. 更新沟通管理计划,以包含新的沟通渠道。
【单选题】
CCF066一个施工项目位于热带地区,该项目的风险登记册包括雨季洪水的风险。现在雨季已经结束,项目即将完成。应使用哪一项工具或技术来管理这个风险? ___
A. 风险规避。
B. 风险审计。
C. 风险接受。
D. 风险转移。
【单选题】
CCF067项目经理的任务是提高组织对其公司“品牌重塑”项目的认识。若要实现这一点,项目经理应该做什么? ___
A. 要求项目管理办公室(PMO)创建内部项目储存库。
B. 确保定期更新公司的社交媒体账户。
C. 确保所有项目文件都存储在项目管理信息系统(PMIS)中,供所有工作人员访问。
D. 更新沟通管理计划,并让组织的内部沟通团队参与。
【单选题】
CCF068根据公司的战略目标,下一年的业务计划中授权了一个关键的效率改进项目。但是,由于投资高,收益有限,负责实施后运营的一个关键相关方强烈反对该项目。项目经理应该做什么? ___
A. 执行全面的相关方分析,并据此影响相关方。
B. 邀请所有相关方讨论担忧的问题,并对未来的行动方案进行投票。
C. 与该关键相关方讨论这些问题,并将其升级上报给发起人以获得指示。
D. 与该相关方召开一对一的头脑风暴会议,以清楚地了解他们担忧的问题。
【单选题】
CCF069一个项目团队正在不同时区工作,团队成员之间经常出现误解。尽管项目经理试图解决这个问题,但这个问题一直没有得到解决。若要改善这种情况,项目经理应该怎么做? ___
A. 修订沟通管理计划。
B. 审查相关方的需求。
C. 在团队会议上讨论这个问题。
D. 与每位团队成员分别解决这个问题。
【单选题】
CCF070一个项目是为了设计新的政府机构服务,其所有可交付成果均已获得验收。设计活动产生了许多机密文件。作为收尾过程的组成部分,项目经理应该做什么? ___
A. 将文件添加到公司知识库以供将来参考。
B. 参阅合同中有关处理机密材料的政策。
C. 从项目管理办公室(PMO)获得有关如何销毁机密材料的指示。
D. 按照 PMO 保留政策归档项目文件。
【单选题】
CCF071这份表中列出的项目活动,活动 A 和 H 作为开始和结束活动,项目的关键路径是什么?--表在答案里。___
A. A-C-D-G-H。
B. A-B-D-E-H。
C. A-B-D-G-H。
D. A-C-F-G-H。
【单选题】
CCF072项目经理希望继续执行项目,但是,一些相关方不愿意批准项目管理计划,项目经理得知这些相关方未阅读该计划,并且似乎没有准备在将来阅读该计划。项目经理下一步应该做什么? ___
A. 使用来自类似项目的信息来影晌相关方采取行动。
B. 以替代形式提交关键信息,以澄清和理解他们的不同点。
C. 更新问题日志,并将问题升级上报给发起人。
D. 要求其他相关方推动该计划的批准。
【单选题】
CCF073在讨论一个新项目的相关方会议上,运营经理表示他们不知道项目经理有权使用他们部门的资源。项目经理应该做什么? ___
A. 让发起人与运营经理会谈。
B. 与运营经理单独会面以澄清期望。
C. 向运营经理发送正式的通知备忘录。
D. 向运营经理提供一份项目章程的副本。
【单选题】
CCF074在施工阶段,一座城市的高端基础设施项目隧道部分遇到排水问题,项目团队正处于寻找解决方案的过程。更新问题日志之后,项目经理应该做什么? ___
A. 请求预算补贴和延长进度计划。
B. 与指导委员会沟通该问题,并提供定期进度更新,直至解决为止。
C. 尽快解决问题,以避免进度计划延迟。
D. 聘请一位外部顾问,就如何高效和经济有效地解决问题提供专家意见。